CURRENT PROJECTS IN BIDDING/ STATUS
Directions to
E. Allen Reeves, Inc.
|
PHILLIPS LIGHTING APPLICATION CENTER
BID DATE:
Friday,
June 27th, 2008 @ 5:00 |
Project Consists of
But Not Limited To:
Complete interior
renovation of the Phillips Theatre, Phillips Hall as well as a new stairwell
themed “the history of light”. We will selectively demolish the space and
provide a complete new fit-out including, but not limited to new finishes,
exhibit fabrications, lighting installation and electronically operated
scrims. Mechanically, there are bathroom renovations, re-distribution of
HVAC and a wet sprinkler system with a pre-action assembly.
|
THE BALA HOUSE MONTESSOURI -
SCHOOL AT THE CHURCH OF ST. ASAPH
BID DATE:
Wednesday,
June 18th, 2008 @ 5:00
|
Project Consists of
But Not Limited To:
6,000 sq ft addition onto existing school
building – site-work, landscaping, concrete, masonry, stone work, railings,
roof trusses, millwork, insulation, shingle and membrane roofing,
doors/frames/hardware, Marvin windows, Hopes windows, drywall, ceramic,
resilient/carpet, painting, wall covering, specialties, window treatment,
residential appliances, HVAC, plumbing, fire protection, and electrical.
|
|
ST. ANDREW'S EPISCOPAL CHURCH
BID DATE:
Wednesday,
May 7th, 2008 @ 5:00 |
Project Consists of
But Not Limited To:
2,600 square feet addition with related site
work. Stucco on masonry, wood trussed roof, standing seam metal roof, wood
windows, light gauge stud/drywall, ceramic, wood floor, resilient carpet,
painting, plumbing, HVAC, electrical
|
|
RYDAL PARK -
DINING RENOVATIONS
BID DATE:
Awarded
Friday,
May 9th, 2008 @ 5:00
|
Project Consists of
But Not Limited To:
A
phased renovation to the existing Café and dining room at Rydal Park, Rydal,
Pennsylvania, consisting of approximately 7,650 square feet of renovated
space and includes new equipment, finishes, and furnishings
|
|
PENN CHARTER SCHOOL
BID DATE:
Awarded
Friday,
February 8th, 2008 @ 5:00 |
Project Consists of
But Not Limited To:
New construction of a new performing arts
building, approximately 30, 100 sq. ft. but is not limited to:
Demolition or removal of: Existing site-work, including but not limited
to plants and trees, sidewalks and fences.
Site work: New plants, shrubs and trees, sidewalks and fences.
Construction of: 30,100 sq. ft. of performing arts building, including
650 seat theater, band and chorus classrooms.
LEED Credit Participation.
|
|
CENTENARY COLLEGE
BID DATE:
Awarded
Wednesday,
February 6th, 2008 @ 1:00
|
Project Consists of
But Not Limited To:
Project is a ground
up construction of a new 70,000 square foot Performing Arts Center. This
project consists of, but is not limited to: new dining facilities, two (2)
theatres, offices, classrooms, and dance, radio & television studios. All
trades are pertinent (except structural steel – this has already been
awarded). Project has a start date of Spring, 2008. Site visit to be
determined at a later date.
|
|
PERELMAN CENTER FOR JEWISH LIFE - LUBAVITCH HOUSE
BID DATE:
Awarded
Wednesday,
January 16th, 2008 @ 1:00
|
Project Consists of
But Not Limited To:
Renovations and
Additions of a Four-Story Duplex and basement, in the City Of Philadelphia
(Approximately 19,000 Square Feet).
|
|