E. Allen Reeves, Inc.
     Construction Managers General Contractors

 

 

 

 

CURRENT PROJECTS IN BIDDING/ STATUS

Directions to E. Allen Reeves, Inc.

PHILLIPS LIGHTING APPLICATION CENTER

BID DATE:
Friday, June 27th, 2008 @ 5:00

 

Project Consists of But Not Limited To:

Complete interior renovation of the Phillips Theatre, Phillips Hall as well as a new stairwell themed “the history of light”.  We will selectively demolish the space and provide a complete new fit-out including, but not limited to new finishes, exhibit fabrications, lighting installation and electronically operated scrims. Mechanically, there are bathroom renovations, re-distribution of HVAC and a wet sprinkler system with a pre-action assembly.

 

THE BALA HOUSE MONTESSOURI -
SCHOOL AT THE CHURCH OF ST. ASAPH

BID DATE:
Wednesday, June 18th, 2008 @ 5:00

 

Project Consists of But Not Limited To: 

6,000 sq ft addition onto existing school building – site-work, landscaping, concrete, masonry, stone work, railings, roof trusses, millwork, insulation, shingle and membrane roofing, doors/frames/hardware, Marvin windows, Hopes windows, drywall, ceramic, resilient/carpet, painting, wall covering, specialties, window treatment, residential appliances, HVAC, plumbing, fire protection, and electrical.

 

ST. ANDREW'S EPISCOPAL CHURCH

BID DATE:
Wednesday, May 7th, 2008 @ 5:00

 

Project Consists of But Not Limited To: 

2,600 square feet addition with related site work.  Stucco on masonry, wood trussed roof, standing seam metal roof, wood windows, light gauge stud/drywall, ceramic, wood floor, resilient carpet, painting, plumbing, HVAC, electrical

 

RYDAL PARK - DINING RENOVATIONS

BID DATE:   Awarded
Friday, May 9th, 2008 @ 5:00

 

Project Consists of But Not Limited To:  

A phased renovation to the existing Café and dining room at Rydal Park, Rydal, Pennsylvania, consisting of approximately 7,650 square feet of renovated space and includes new equipment, finishes, and furnishings

 

PENN CHARTER SCHOOL

BID DATE:   Awarded
Friday, February 8th, 2008 @ 5:00

 

Project Consists of But Not Limited To:

New construction of a new performing arts building, approximately 30, 100 sq. ft. but is not limited to:
   Demolition or removal of: Existing site-work, including but not limited to plants and trees, sidewalks and fences.
   Site work: New plants, shrubs and trees, sidewalks and fences.
   Construction of: 30,100 sq. ft. of performing arts building, including 650 seat theater, band and chorus classrooms.
   LEED Credit Participation.

 

CENTENARY COLLEGE

BID DATE:  Awarded
Wednesday, February 6th, 2008 @ 1:00

 

Project Consists of But Not Limited To:

Project is a ground up construction of a new 70,000 square foot Performing Arts Center.  This project consists of, but is not limited to: new dining facilities, two (2) theatres, offices, classrooms, and dance, radio & television studios.  All trades are pertinent (except structural steel – this has already been awarded).  Project has a start date of Spring, 2008.  Site visit to be determined at a later date.

 

PERELMAN CENTER FOR JEWISH LIFE - LUBAVITCH HOUSE

BID DATE:  Awarded
Wednesday, January 16th, 2008 @ 1:00

 

Project Consists of But Not Limited To:

Renovations and Additions of a Four-Story Duplex and basement, in the City Of Philadelphia (Approximately 19,000 Square Feet).

 

                          1145 York Road    ·   Abington, PA  19001    ·    (215) 884-2255    ·   Fax (215) 884-7059  ·    info@eareeves.com